R-pod Owners Forum Homepage

This site is free to use.
Donations benefit a non-profit Girls Softball organization

Forum Home Forum Home > R-pod Discussion Forums > Podmods, Maintenance, Tips and Tricks
  New Posts New Posts RSS Feed: Battery Monitor wiring
  FAQ FAQ  Forum Search   Calendar   Register Register  Login Login

Topic ClosedBattery Monitor wiring

 Post Reply Post Reply Page  12>
Author
Message Reverse Sort Order
Olddawgsrule View Drop Down
Senior Member
Senior Member


Joined: 20 Sep 2017
Location: New Hampshire
Online Status: Offline
Posts: 1014
Direct Link To This Post Topic: Battery Monitor wiring
    Posted: 17 Apr 2021 at 2:57pm
I read you wish to have your meter inside and easy to see. That's fine. Once you get used to what you use and how to extend your available power, you'll find you're not check it as much, or at least I found that. I placed my meter at the battery. 

My controller I placed on the back of my solar panel with another of those meters. Between the two it gave me input and usage to reference. I'd probably not place the second meter on the panel again, yet it was fun to see what a day could produce in real life. 

I like the cumulative meters and reset them before embarking on the next journey. Now, I mainly watch voltage and have a decent clue of what SOC is.  


I have one for lithium as well if another so desires.
Byways no Highways
2017 Tacoma
Truck Camper Build
2004 F150 My Overlander
Back to Top
geewizard View Drop Down
Senior Member
Senior Member


Joined: 16 Apr 2017
Location: Spokane
Online Status: Offline
Posts: 347
Direct Link To This Post Posted: 17 Apr 2021 at 11:23am
My wiring loom starts at the battery box and goes back to where the wiring enters the floor by the fuse box.  I opened the loom and laid the wire inside then used good quality cable ties to keep the loom closed.

Yesterday, I installed two 12v group 27 AGM deep cycle batteries to replace the two group 27 12v "RV" batteries that came with the Pod.  I chose FullRiver DC105-12 batteries.

I keep them charged with a 100W solar panel.
2021 Winnebago Micro Minnie 1708FB
2017 R-Pod 177 (Blue) HRE SOLD
2004 Outfitter Apex 8 camper
2014 Toyota Tundra DC
Back to Top
john in idaho View Drop Down
Senior Member
Senior Member
Avatar

Joined: 04 Nov 2014
Location: Eagle Idaho
Online Status: Offline
Posts: 611
Direct Link To This Post Posted: 17 Apr 2021 at 9:47am
It has been a while, but I picked up(from amazon) a small digital voltmeter dial  and switch.  the supplied idiot lights in the wall slip out easily and reveal the wiring.  I picked a lead that measured battery voltage and hooked the new meter and switch to it, then poked a hole in the wall above the idiot light to mount the new gauge.  Been working fine for about 3 years.
Back to Top
Welchsoft View Drop Down
Groupie
Groupie


Joined: 08 Jul 2020
Online Status: Offline
Posts: 58
Direct Link To This Post Posted: 17 Apr 2021 at 9:36am
Reviewed the pictures, thanks. Similar (but much nicer) to my double 6V setup.  Where does the wiring loom start and end?  Did you fish wire through it, or open it and lay the wire into it?
Back to Top
geewizard View Drop Down
Senior Member
Senior Member


Joined: 16 Apr 2017
Location: Spokane
Online Status: Offline
Posts: 347
Direct Link To This Post Posted: 17 Apr 2021 at 8:51am
I ran my battery monitor cable inside the wiring loom.  Yes, it took some time but I wanted a good installation that I did only once.

My shunt is mounted inside the battery box next to the batteries and alongside my MPPT solar controller and battery switch.

You can see pics of my battery box if you do a search on my username.
2021 Winnebago Micro Minnie 1708FB
2017 R-Pod 177 (Blue) HRE SOLD
2004 Outfitter Apex 8 camper
2014 Toyota Tundra DC
Back to Top
offgrid View Drop Down
Senior Member
Senior Member


Joined: 23 Jul 2018
Online Status: Offline
Posts: 5290
Direct Link To This Post Posted: 16 Apr 2021 at 3:42pm
Can't help you with those specifics, I have a 179 so the routing is different and there is no underside covering material in the way. Maybe someone with the same trailer might be able to help.
1994 Chinook Concourse
1995 RV6A Experimental Aircraft
2015 Rpod 179 - sold
Back to Top
Welchsoft View Drop Down
Groupie
Groupie


Joined: 08 Jul 2020
Online Status: Offline
Posts: 58
Direct Link To This Post Posted: 16 Apr 2021 at 3:34pm
Thanks for the feedback.  Looking for some specific details on running the wires.  I do understand how to wire the battery monitor but how to get the wires fished from point A to point B is my challenge.  Any thoughts on how to run the battery monitor wires?  Wall, side, ceiling, snake it down to the top of the corrugated, etc.?  I'm thinking that my solar controller already has its wires from this location back to the battery but not sure their path back.  Just need some advice on a possible approach with minimal removal of the underside corrugated. 
Back to Top
offgrid View Drop Down
Senior Member
Senior Member


Joined: 23 Jul 2018
Online Status: Offline
Posts: 5290
Direct Link To This Post Posted: 16 Apr 2021 at 2:22pm
Ok, you have a monitor with a shunt that goes in the negative leg. Good.

The shunt needs to be mounted in the negative leg at any point between the battery negative post and the first place a load or source is connected. That way it can measure all the current in and out of the battery.

So if you say have a solar charge controller connected at the battery terminals then yes the shunt would need to be mounted there and the negative conductor to the controller relocated to the side of the shunt away from the battery.

If the first place anything is connected to the negative lead from the battery is at the panel then you can mount the shunt there.
1994 Chinook Concourse
1995 RV6A Experimental Aircraft
2015 Rpod 179 - sold
Back to Top
podwerkz View Drop Down
Senior Member
Senior Member
Avatar

Joined: 11 Mar 2019
Location: Texas
Online Status: Offline
Posts: 966
Direct Link To This Post Posted: 16 Apr 2021 at 1:11pm
Yes, if you have a shunt (amps in/out or 'coulomb counter') then that does need to be mounted at the battery negative terminal...normally.

I would mount the display wherever the shortest run and easiest mounting surface would be. 

If that is near a door or window or near the converter, then so be it. 
r・pod 171 gone but not forgotten!
Back to Top
Welchsoft View Drop Down
Groupie
Groupie


Joined: 08 Jul 2020
Online Status: Offline
Posts: 58
Direct Link To This Post Posted: 16 Apr 2021 at 11:25am
Thanks.  The manufacturer recommends that the shunt be mounted on the battery negative at the battery, then all other negatives on the other side of the shunt.  But your idea would make it easier.

Back to Top
 Post Reply Post Reply Page  12>

Forum Jump Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.64
Copyright ©2001-2009 Web Wiz